Woodberry KSS4
Hackeny, London, N4 2SB

Contract Value:
£9.5 Million
Acting as Principal Contractor for the initial 35 weeks CCL install both contiguous and bearing piles, excavated and constructed basement car park. Construct frames up to 18 floors, utilising precast columns and jump form construction for the cores. Titan Screen Saver was installed on the upper floors of the tower.
Scope of Works:
- Principal contractor role
- Piling, both contiguous and bearing piles
- Bulk excavation
- Basement construction
- Podium construction
- Frame & upper floors up to 18 floors
- External Works
- Lightening protection
- Provision and operation of Tower Cranes