Scope of works

  • Attend piling contractor
  • Install pile caps, lift core and crane bases
  • Install drainage system including deep sewer connection
  • Sheet piling along boundary with existing PH5 block
  • Construct RC basement works with consideration to constraints on logistics and working alongside the River Thames
  • Construction of 2 RC frames, of 16 and 19 floors.
  • The RC Frames include complex falsework designs for the external beam and column details on the river elevation.

↓