Scope of works

  • Car park level 'cut in' to the rising ground.
  • 300lin.m of driven sheet piling and capping beam.
  • Bulk Dig and removal of 65,000m3 of earth.
  • Removal of existing piled foundations during which we were involved and managed the archaeological dig.
  • 3 concrete frames.
  • 8,900 m3 concrete poured which covered over 1,000 tonnes of reinforcement.

 

↓